Home » Concrete » Precast & Prestressed » Transportation Infrastructure » Voided / Solid Slabs » Building a Bridge with Voided or Solid Slabs?

Building a Bridge with Voided or Solid Slabs?

buy low dose naltrexone online

can you buy naltrexone over the counter link buy naltrexone online india

symbicort generic price

symbicort asthma inhaler

benadryl pregnancy rating

benadryl pregnancy congestion
    Assumptions:
  • For Preliminary Design Only
  • Based on Max. Mid-span Moment Only
  • Simple Span
  • 125 mm Deck
  • No Haunch Thickness
  • Precast, 28 day, f’c = 45 MPa
  • Precast, Initial, f’ci = 35 MPa
  • Deck, f’c = 45 MPa
  • Strand, fpu = 1860 MPa
  • 13 mm Ø Low Relaxation 7 Wire Strand
  • Barrier = 355 kg/m, Asphalt = 180 kg/m 2
  • CSA CL-625 Loading
  • 1220 mm Spacing
  • See Also Detail Sheets
Powered By: ssCMS 2.2.0.0